Wednesday, March 24, 2010
Presentation-Testing Method
This were I tested my different bridge types with different loads sizes. The way that this will work is by connecting a bucket on to the bridge and then putting in loads one at a time until the bridge fails to maintain its self then that’s when I shall count the loads and see how much it was able to sustain. In order to keep the bridges from skewing and not receiving the correct results I decided to add an extra wall so that the bridge would not collapse to its side. This would then allow for better testing of the bridge's actually design.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment